Today ‹ Prev Next ›
Planned Weld Meters
331.6 m
1,480 pcs planned
Actual Weld Meters
230.8 m
69.5%
Total Downtime
0 min
Rejects: 0 pcs
Actual Qty
1,078
72.8% by pieces

Plan vs Actual Weld Meters by Robot

OEE by Robot

Production Detail

RobotShiftPart Plan (m)Actual (m)Achievement Qty PlanQty Actual RejectsDT (min)DT CategoryReason
Robot 1 Day Shift Seat Belt Bkt 40.0 29.5 72.5% 1,000 738
Robot 1 Day Shift KSRTC 2st Br Patti 54.0 49.5 90.7% 120 110
Robot 4 Day Shift KSRTC 3st Br Patti 66.0 39.6 59.1% 100 60
Robot 5 Day Shift GSRTC Lh Leg 3x2 66.0 39.6 59.1% 100 60
Robot 6 Day Shift GSRTC Rh Leg 2x2 52.8 33.0 63.5% 80 50
Robot 6 Day Shift GSRTC Rh leg 3x2 52.8 39.6 75% 80 60
TOTAL 331.6 230.8 69.5% 1,480 1,078

Part-wise Breakdown

PartJob CodePlan QtyActual QtyAchievementWeld Meters (m)
Seat Belt Bkt JOB-013 1,000 738 73.8% 29.5
KSRTC 2st Br Patti JOB-004 120 110 91.7% 49.5
GSRTC Rh leg 3x2 80 60 75% 39.6
KSRTC 3st Br Patti JOB-005 100 60 60% 39.6
GSRTC Lh Leg 3x2 100 60 60% 39.6
GSRTC Rh Leg 2x2 JOB-003 80 50 62.5% 33.0

OEE Summary by Robot

Performance uses plan/actual if no cycle time set in Parts master
RobotPlanned (min)Run Time (min) AvailabilityPerformanceQualityOEE Actual QtyRejects
Robot 1 633 633 100% 91.1% 100% 91.1% 848
Robot 2 No Plan 0% 0% 0% 0%
Robot 3 No Plan 0% 0% 0% 0%
Robot 4 633 633 100% 30.2% 100% 30.2% 60
Robot 5 633 633 100% 31.6% 100% 31.6% 60
Robot 6 633 633 100% 57.9% 100% 57.9% 110
Robot 7 No Plan 0% 0% 0% 0%
Robot 8 No Plan 0% 0% 0% 0%

OEE at a Glance — Dept. Average

4 robots with data
50.0% Availability
26.4% Performance
50.0% Quality
26.4% OEE