Utilization Report
11-Mar-2026
Available Time
6,963 min
Fleet total · 8 robots
Plan Utilization
105.5%
7,345.4 / 6,963 min planned
Actual Utilization
0%
0.0 / 6,963 min actual
Plan Achievement
0%
Actual vs planned cycle time
Shift Utilization by Robot (%)
| Robot | Available (min) | Planned (min) | Plan % | Actual (min) | Actual % | Plan Achievement | Notes |
|---|---|---|---|---|---|---|---|
| Robot 1 | 1,266 | 1,352.7 |
106.8% |
— |
0% |
0% | |
| Robot 2 | — | — | — | — | — | — | No entries |
| Robot 3 | 633 | 704.7 |
111.3% |
— |
0% |
0% | |
| Robot 4 | 1,266 | 1,812.2 |
143.1% |
— |
0% |
0% | |
| Robot 5 | 1,266 | 1,576.0 |
124.5% |
— |
0% |
0% | |
| Robot 6 | 633 | 533.3 |
84.2% |
— |
0% |
0% | |
| Robot 7 | 1,266 | 1,017.5 |
80.4% |
— |
0% |
0% | |
| Robot 8 | 633 | 349.0 |
55.1% |
— |
0% |
0% | |
| Fleet Total | 6,963 | 7,345.4 | 105.5% | 0.0 | 0% | 0% |
Utilization is calculated from ideal cycle time × quantity. Parts without a cycle time set contribute 0 minutes — set cycle times in Parts master for accurate results.