Today
Available Time
6,963 min
Fleet total · 8 robots
Plan Utilization
105.5%
7,345.4 / 6,963 min planned
Actual Utilization
0%
0.0 / 6,963 min actual
Plan Achievement
0%
Actual vs planned cycle time
Shift Utilization by Robot (%)
Robot Available (min) Planned (min) Plan % Actual (min) Actual % Plan Achievement Notes
Robot 1 1,266 1,352.7 106.8%
0%
0%
Robot 2 No entries
Robot 3 633 704.7 111.3%
0%
0%
Robot 4 1,266 1,812.2 143.1%
0%
0%
Robot 5 1,266 1,576.0 124.5%
0%
0%
Robot 6 633 533.3 84.2%
0%
0%
Robot 7 1,266 1,017.5 80.4%
0%
0%
Robot 8 633 349.0 55.1%
0%
0%
Fleet Total 6,963 7,345.4 105.5% 0.0 0% 0%

Utilization is calculated from ideal cycle time × quantity. Parts without a cycle time set contribute 0 minutes — set cycle times in Parts master for accurate results.