Planned Weld Meters
10,581.3 m
38,854 pcs planned
Actual Weld Meters
6,110.4 m
57.7%
Actual Qty
26,801
69% by pieces
Best Day
08 Mar
78.4% meter achievement

Daily Weld Meter Trend — March 2026

Robot Plan vs Actual — Weld Meters

Daily Achievement %

Robot-wise Monthly Summary

Robot Plan (m)Actual (m)Achievement Qty PlanQty Actual RejectsDT (min) AvailPerfQualOEE
Robot 1 1,695.0 1,217.5 71.8% 24,130 18,157 338 97% 79.6% 100% 77.2%
Robot 2 573.8 383.8 66.8% 1,510 1,010 1436 72.8% 54.5% 99.5% 39.4%
Robot 3 1,686.0 1,253.2 74.3% 3,700 2,821 360 96.5% 72.1% 99.9% 69.5%
Robot 4 1,177.6 462.2 39.3% 1,874 776 420 93.9% 36.7% 99.5% 34.3%
Robot 5 2,075.1 1,073.4 51.7% 3,160 1,634 963 91.5% 54.3% 99.8% 49.6%
Robot 6 2,136.8 1,131.2 52.9% 3,280 1,714 240 97.9% 53.6% 99.2% 52%
Robot 7 762.0 366.6 48% 820 511 270 95.7% 47.7% 97.7% 44.6%
Robot 8 475.0 222.5 46.7% 380 178 100% 27.3% 100% 27.3%
TOTAL 10,581.3 6,110.4 57.7% 38,854 26,801 4027

Part-wise Breakdown

PartJob CodePlan QtyActual QtyAchievementWeld Meters (m)
Seat Belt Bkt JOB-013 22,350 16,959 75.9% 678.4
PB Bkt Front JOB-010 2,740 1,723 62.9% 1,120.0
PB Bkt Rear JOB-011 1,910 1,531 80.2% 382.8
KSRTC 2st Br Patti JOB-004 1,880 1,338 71.2% 602.1
Slim Leg Lh JOB-016 1,660 1,040 62.7% 395.2
GSRTC Rh leg 3x2 1,730 966 55.8% 637.6
GSRTC Rh Leg 2x2 JOB-003 1,720 842 49% 555.7
GSRTC Lh Leg 3x2 1,320 698 52.9% 460.7
Pb leg LH 1,020 374 36.7% 243.1
GSRTC Lh Leg 2x2 JOB-002 670 338 50.4% 223.1
Tnstc Leg Lh JOB-019 350 296 84.6% 148.0
KSRTC 3st Br Patti JOB-005 504 202 40.1% 133.3
Tnstc Leg Rh JOB-020 150 114 76% 57.0
PB SB Assly JOB-012 320 101 31.6% 161.6
Slim 2st Back JOB-015 190 89 46.8% 111.3
Slim 2s Seatbase TC JOB-001 190 89 46.8% 111.3
Tnstc 2St Sb Frame 100 71 71% 78.1
Slim Leg Rh JOB-018 50 30 60% 11.4