Planned: 633 min — 10h 33m
Best Arc Efficiency
62.9%
Slim 2st Back
Max Arc Time / Shift
396.7 min
for Slim 2st Back
Best Capacity / Shift
136 pcs
for Slim 2st Back

Parts Ranked by Arc Efficiency

# Part Job Code Cycle Time (s) Load (s) Arc (s) Unload (s) Arc Efficiency Capacity / Shift Arc Time / Shift
1 Slim 2st Back JOB-015 278.0 65.0 175.0 38.0
62.9%
136 pcs 396.7 min (63% of shift)
2 Pb leg LH 235.0 65.0 145.0 25.0
61.7%
161 pcs 389.1 min (61% of shift)
3 GSRTC Lh Leg 2x2 JOB-002 200.0 55.0 110.0 35.0
55%
189 pcs 346.5 min (55% of shift)
4 GSRTC Lh Leg 3x2 200.0 55.0 110.0 35.0
55%
189 pcs 346.5 min (55% of shift)
5 GSRTC Rh Leg 2x2 JOB-003 200.0 55.0 110.0 35.0
55%
189 pcs 346.5 min (55% of shift)
6 GSRTC Rh leg 3x2 200.0 55.0 110.0 35.0
55%
189 pcs 346.5 min (55% of shift)
7 Tnstc 2St Sb Frame 480.0 185.0 260.0 35.0
54.2%
79 pcs 342.3 min (54% of shift)
8 Low Back Lh JOB-006 170.0 55.0 90.0 25.0
52.9%
223 pcs 334.5 min (53% of shift)
9 Low Back Rh JOB-007 170.0 55.0 90.0 25.0
52.9%
223 pcs 334.5 min (53% of shift)
10 Oyster Leg Lh JOB-008 170.0 55.0 90.0 25.0
52.9%
223 pcs 334.5 min (53% of shift)
11 Oyster Leg Rh JOB-009 170.0 55.0 90.0 25.0
52.9%
223 pcs 334.5 min (53% of shift)
12 Slim Leg Lh JOB-016 170.0 55.0 90.0 25.0
52.9%
223 pcs 334.5 min (53% of shift)
13 Slim Leg Rh JOB-018 170.0 55.0 90.0 25.0
52.9%
223 pcs 334.5 min (53% of shift)
14 PB Bkt Rear JOB-011 76.0 24.0 40.0 12.0
52.6%
499 pcs 332.7 min (53% of shift)
15 KSRTC 3st Br Patti JOB-005 191.0 65.0 98.0 28.0
51.3%
198 pcs 323.4 min (51% of shift)
16 KSRTC 2st Br Patti JOB-004 187.0 68.0 95.0 24.0
50.8%
203 pcs 321.4 min (51% of shift)
17 PB Bkt Front JOB-010 194.0 74.0 98.0 22.0
50.5%
195 pcs 318.5 min (50% of shift)
18 Tnstc Leg Lh JOB-019 232.0 98.0 115.0 19.0
49.6%
163 pcs 312.4 min (49% of shift)
19 Tnstc Leg Rh JOB-020 232.0 98.0 115.0 19.0
49.6%
163 pcs 312.4 min (49% of shift)
20 PB SB Assly JOB-012 555.0 210.0 275.0 70.0
49.5%
68 pcs 311.7 min (49% of shift)
21 Seat Belt Bkt JOB-013 19.0 7.0 9.0 3.0
47.4%
1,998 pcs 299.7 min (47% of shift)
22 Side Gusset JOB-014 18.0 7.0 8.0 3.0
44.4%
2,110 pcs 281.3 min (44% of shift)
23 Slim 2s Seatbase TC JOB-001 420.0 210.0 185.0 25.0
44%
90 pcs 277.5 min (44% of shift)
How Arc Efficiency is Calculated
Arc Efficiency % = Arc Time (s) ÷ Cycle Time (s) × 100
Parts with higher arc efficiency deliver more welding per unit time — ideal for maximising robot utilisation.
Arc Time / Shift = Capacity × Arc Time (s) ÷ 60 — total minutes the robot is actually welding during the shift.
Set arc time and cycle time breakdowns in Parts Master.